check the last run time. this is the second time I ahve seen this. if the last run is in the future. lets say today is 6/13/06 but the last run for the exchange process in and out tasks say last run 6/31/06 it will not trigger the tasks to run, even though the next run dates say 6/14/06 it willn not run. Manually run the tasks from the scheduler then the last run date will be set for today and then it works.
what casues this? usually people are messing arouund with the clock in windows and the jobs get triggered to run.
in answer book and blogged